Service entrance conductors are the conductors that connect the utility's service drop or service lateral to your service equipment. On an overhead service they run from the point of connection near the weatherhead, down through the meter base, to the main breaker; on an underground service they start where the service lateral or underground service conductors end. They are sized under NEC 230.42 from the calculated load, and for most houses the 83% rule in 310.12 sets the size.
This guide defines every part of a service the way Article 100 does (the vocabulary itself is an exam topic), shows how to size the conductors with worked examples, and collects the Article 230 numbers you need: minimum sizes, clearances, disconnect ratings and the number of disconnects.
The parts of a service, defined
Exam questions on Article 230 often test definitions more than math. Learn these from Article 100:
| Term | What it is | Who usually installs it |
|---|---|---|
| Service point | Point of connection between the utility's facilities and the premises wiring | Set by the utility |
| Service drop | Overhead conductors between the utility supply and the service point | Utility |
| Service lateral | Underground conductors between the utility supply and the service point | Utility |
| Overhead service conductors | Overhead conductors between the service point and the first point of connection to the service-entrance conductors | Electrician (when the service point is at the pole) |
| Underground service conductors | Underground conductors between the service point and the first point of connection to the service-entrance conductors | Electrician (when the service point is at the transformer or pedestal) |
| Service-entrance conductors | Conductors between the service equipment terminals and the point of connection to the drop, lateral, or overhead/underground service conductors | Electrician |
| Service equipment | The main disconnect and its overcurrent protection, generally at the building | Electrician |
How to size service entrance conductors (230.42)
NEC 230.42(A) requires service-entrance conductors to have an ampacity not less than the load to be served, calculated under Article 220. For loads that include continuous loads, the conductor ampacity must be at least the noncontinuous load plus 125% of the continuous load, with adjustment and correction factors applied where required.
230.42(A)
Ampacity ≥ noncontinuous load + 1.25 × continuous load
NEC 230.42(B) adds a floor: the ungrounded conductors can't have an ampacity less than the minimum disconnect rating required by NEC 230.79 for that type of installation. NEC 230.42(C) covers the grounded (neutral) conductor: it must be at least the size required by NEC 250.24(D) (Table 250.102(C)(1), based on the ungrounded conductor size), even when the calculated neutral load is small. Older books call this 250.24(C); the 2023 NEC renumbered it.
The load itself comes from Article 220. For a house, that means the standard method dwelling load calculation or the optional method.
Dwellings: the 83% rule (310.12)
For a single-phase, 120/240 V dwelling service rated 100 through 400 A that supplies the entire load of the dwelling, NEC 310.12 permits service conductors with an ampacity of not less than 83% of the service rating. If the installation needs ampacity adjustment or correction (hot rooftop, bundling, more than three current-carrying conductors), apply those factors to the conductor as usual. With no adjustment, using the 75°C column of Table 310.16:
| Service rating | 83% | Copper | Aluminum |
|---|---|---|---|
| 100 A | 83 A | 4 AWG (85 A) | 2 AWG (90 A) |
| 125 A | 103.75 A | 2 AWG (115 A) | 1/0 AWG (120 A) |
| 150 A | 124.5 A | 1 AWG (130 A) | 2/0 AWG (135 A) |
| 200 A | 166 A | 2/0 AWG (175 A) | 4/0 AWG (180 A) |
| 225 A | 186.75 A | 3/0 AWG (200 A) | 250 kcmil (205 A) |
The 200 amp service wire size guide covers the exceptions in depth, and 400 amp services explains the parallel sets and 320 A meters you see at the top of the range.
→The 83% rule in depthWire Size for a 200 Amp Service: The 83% Rule (NEC 310.12)Commercial service with continuous loads
- 1
The question
A small commercial building has a calculated load of 180 A continuous and 60 A noncontinuous on a 208Y/120 V, 3-phase service. All terminations are rated 75°C. What size copper service-entrance conductors are required?
- 2
Apply 230.42(A)
(180 × 1.25) + 60 = 225 + 60 = 285 A
- 3
Table 310.16, 75°C copper
250 kcmil = 255 A (too small). 300 kcmil = 285 A
- 4
Overcurrent protection
A 300 A service device is permitted on 285 A conductors under the next-size-up rule of 240.4(B), because 285 A is not a standard rating and the device is 800 A or less.
Minimum sizes and minimum disconnect ratings
Two sets of minimums show up on exams, and they are easy to confuse.
Conductor minimums:
- Overhead service conductors: not smaller than 8 AWG copper or 6 AWG aluminum NEC 230.23(B), with a 12 AWG hard-drawn copper exception for limited loads.
- Underground service conductors: not smaller than 8 AWG copper or 6 AWG aluminum NEC 230.31(B), with an exception allowing 12 AWG copper or 10 AWG aluminum for limited single-branch-circuit loads.
Service disconnect minimums NEC 230.79:
| Installation | Minimum rating |
|---|---|
| (A) One-circuit installation | 15 A |
| (B) Two-circuit installation | 30 A |
| (C) One-family dwelling | 100 A, 3-wire |
| (D) All other installations | 60 A |
100 A
minimum one-family dwelling service
83%
dwelling service conductors (310.12)
12 ft
over residential driveways
Clearances for overhead service conductors
NEC 230.24(B) sets the vertical clearance from final grade, based on what is underneath and the voltage to ground:
| Over | Voltage to ground | Minimum clearance |
|---|---|---|
| Areas accessible to pedestrians only, the service entrance and the lowest point of the drip loop (cabled service-drop conductors on a grounded bare messenger only) | 150 V or less | 10 ft |
| Residential property and driveways; commercial areas not subject to truck traffic | 300 V or less | 12 ft |
| Same areas as the 12 ft row | over 300 V | 15 ft |
| Public streets, alleys, roads, parking areas subject to truck traffic, non-residential driveways | any | 18 ft |
| Track rails of railroads | any | 24 ft 6 in. |
Other numbers that go with it:
- Above roofs: generally 8 ft 6 in of vertical clearance NEC 230.24(A), with exceptions that reduce it for steeper roofs and for the short overhang a service mast passes through.
- Point of attachment: not less than 10 ft above finished grade NEC 230.26.
- Windows, doors, porches and balconies: open service conductors and multiconductor cable without an overall outer jacket need 3 ft of clearance from windows designed to be opened, doors, porches, balconies, stairs and similar locations NEC 230.9(A); conductors run above the top level of a window are exempt.
Installation rules for SE conductors
- Keep other conductors out. Conductors other than service conductors can't be installed in the same service raceway or service-entrance cable NEC 230.7, except grounding and bonding conductors and a few listed load-management conductors.
- One set per drop or lateral. Each service drop, set of overhead service conductors, set of underground service conductors or service lateral supplies one set of service-entrance conductors, with exceptions for multiple occupancies and separate enclosures NEC 230.40.
- Wiring methods: service-entrance conductors must use one of the methods listed in NEC 230.43 (RMC, IMC, EMT, PVC, SE cable and others).
- Physical protection: SE cable subject to damage needs protection, for example RMC, IMC, Schedule 80 PVC or EMT NEC 230.50.
- Service heads and drip loops: the service head goes above the point of attachment (with an exception allowing up to 24 in. from it where that is impractical), and drip loops are formed so water can't enter the raceway NEC 230.54.
The service disconnect: location, number and the 2023 rules
Location. The service disconnect must be in a readily accessible location, either outside the building or inside nearest the point of entrance of the service conductors NEC 230.70(A)(1). Many jurisdictions set a maximum length for SE conductors inside the building; the NEC itself leaves that distance to the authority having jurisdiction.
Number. Each service has one disconnecting means unless the conditions of NEC 230.71(B) are met, which permit two to six. Since the 2020 NEC, those two to six must be in separate enclosures, separate panelboards each with a main, or separate switchboard sections or compartments. The old practice of six main breakers in one panelboard with no main is no longer allowed for new work.
Emergency disconnect. One- and two-family dwellings need an emergency disconnecting means in a readily accessible outdoor location on or within sight of the dwelling NEC 230.85, marked "EMERGENCY DISCONNECT" with the appropriate service or meter wording. It can be the service disconnect itself, a meter disconnect, or another listed switch or breaker suitable for use as service equipment. The 2023 edition also applies the rule when service equipment is replaced.
Surge protection. Services supplying dwelling units must have a Type 1 or Type 2 surge-protective device NEC 230.67.
Mistakes that cost points on service questions
Calling the service drop a service-entrance conductor. The drop is on the utility side of the service point.
Using the 83% rule for a commercial or three-phase service. It's for single-phase 120/240 V dwellings carrying the entire load.
Sizing from the disconnect rating alone. 230.42(A) sizes from the calculated load (with 125% for continuous loads); 230.42(B) only sets a floor.
Mixing conductor minimums with disconnect minimums. 8 AWG Cu / 6 AWG Al is the smallest service conductor; 100 A is the smallest one-family service disconnect.
Forgetting the neutral minimum. The service neutral must meet 250.24(D) (Table 250.102(C)(1)) even when the calculated unbalanced load is small. See grounding electrode conductor sizing for the related Table 250.102(C)(1) and 250.66 lookups.
Exam-style questions
Exam-style question
What is the minimum rating of the service disconnecting means for a one-family dwelling?
Pick an answer to see the explanation.
Exam-style question
A one-family dwelling has a 150 A, 120/240 V service supplying the entire load. Using 310.12, what is the minimum size aluminum service-entrance conductor?
Pick an answer to see the explanation.
Exam-style question
Overhead service conductors on a 120/240 V system cross a residential driveway. What is the minimum vertical clearance from final grade?
Pick an answer to see the explanation.
Exam-style question
Which of these is on the utility side of the service point and generally outside the scope of the NEC?
Pick an answer to see the explanation.
Where to go next
Service conductors are the last step of every load calculation. If you haven't yet, work through the standard method dwelling load calculation, which ends with exactly this sizing step, and the transformer calculations guide for services fed through on-site transformers. For bonding at the service, read main bonding jumper vs system bonding jumper, and for clearances in front of the equipment, working clearance under 110.26.
Article 230 is in NFPA 70, readable through the NFPA 70 page. Then test your service knowledge under exam conditions with a free journeyman practice test.