NEC 110.26 working clearance is the clear space you must keep in front of panelboards, switchboards, disconnects and other equipment that may be serviced while energized. For a typical 120/240-volt or 208Y/120-volt panel, the minimum is 3 feet deep, 30 inches wide and 6½ feet high. On 277/480-volt equipment, the depth grows to 3½ or 4 feet depending on what faces the equipment.

This guide covers every part of NEC 110.26 you will be tested on: the depth table and its three conditions, width, height, the 2023 changes, dedicated space, entrances and doors, illumination, and the mistakes inspectors and exam writers look for. Each rule comes with a worked example, so you can apply it in seconds on exam day and on the job.

What NEC 110.26 covers

NEC 110.26 applies to electrical equipment operating at 1000 volts, nominal, or less to ground that is likely to require examination, adjustment, servicing or maintenance while energized. In practice, that is nearly every panelboard, switchboard, switchgear, motor control center, disconnect switch, motor controller and meter-and-main combination.

The section has seven main parts. Learn them in this order, because exam questions follow it:

PartTopicThe number to remember
110.26(A)(1)DepthTable: 3 to 5 ft
110.26(A)(2)Width30 in. or equipment width
110.26(A)(3)Height6½ ft or equipment height
110.26(B)Clear spacesNo storage
110.26(C)Entrance and egress24 in. × 6½ ft, 1200 A, 800 A doors
110.26(D)IlluminationNot automatic-only
110.26(E)Dedicated equipment space6 ft above the equipment

The purpose is simple: if someone is working on energized parts and something goes wrong, they need room to move, room to back away, and a clear path out.

Depth: Table 110.26(A)(1) and the three conditions

Depth is measured from the exposed live parts, or from the front of the enclosure or opening if the live parts are enclosed. The required depth depends on two things: the nominal voltage to ground and the condition of the space.

Nominal voltage to groundCondition 1Condition 2Condition 3
0–150 V3 ft3 ft3 ft
151–600 V3 ft3½ ft4 ft
601–1000 V3 ft4 ft5 ft

The three conditions describe what is on the other side of the working space:

  • Condition 1: exposed live parts on one side, and no live or grounded parts on the other side. Exposed live parts on both sides that are effectively guarded by insulating materials also count as Condition 1.
  • Condition 2: exposed live parts on one side and grounded parts on the other. Concrete, brick and tile walls are considered grounded.
  • Condition 3: exposed live parts on both sides of the working space.
Live parts3 ftNothing / insulatedCondition 1Live parts3½ ftGrounded (concrete)Condition 2Live parts4 ftLive partsCondition 3
Plan view of the three conditions for equipment operating at 151 to 600 volts to ground.

Voltage to ground, not line-to-line

This is the detail that decides most depth questions. The table uses voltage to ground, so you have to know the system:

SystemVoltage to groundTable row
120/240 V, single-phase120 V0–150 V
208Y/120 V, 3-phase120 V0–150 V
240/120 V high-leg delta208 V on the high leg151–600 V
480Y/277 V, 3-phase277 V151–600 V
480 V delta, ungrounded480 V (greatest voltage between conductors)151–600 V
600Y/347 V, 3-phase347 V151–600 V

The high-leg delta is the classic trap: it looks like a 240-volt system, but the high leg sits about 208 volts to ground, which puts the equipment in the 151–600 volt row. See high-leg delta for where that 208 volts comes from, and delta vs wye for the voltage-to-ground of each system. For an ungrounded system, the NEC defines voltage to ground as the greatest voltage between the conductor and any other conductor of the circuit.

The three exceptions to the depth table

NEC 110.26(A)(1) includes three relaxations worth knowing:

  • (a) Dead-front assemblies. No working space is required at the back or sides of dead-front assemblies such as switchboards, switchgear or motor control centers when every connection and renewable or adjustable part is accessible from the front. Where rear access is needed to work on non-electrical parts, a horizontal working space of 30 inches is required.
  • (b) Low voltage. By special permission, smaller spaces are allowed where all exposed live parts operate at not more than 30 volts rms, 42 volts peak or 60 volts dc.
  • (c) Existing buildings. When equipment is replaced in an existing building, Condition 2 clearance is permitted between dead-front equipment facing each other across an aisle, provided written procedures prohibit both sides from being open at the same time and only authorized, qualified persons service the installation.

Width: 30 inches or the width of the equipment

NEC 110.26(A)(2): the working space must be at least 30 inches wide or the width of the equipment, whichever is greater. In all cases, the space must allow equipment doors and hinged panels to open at least 90 degrees.

Two points that are tested over and over:

  • The equipment does not have to be centered in the working space. A 14-inch-wide panel can sit at one edge of a 30-inch-wide space.
  • A 42-inch-wide switchboard needs a 42-inch-wide working space, not 30. The 30 inches is a minimum, not a fixed number.
Structural ceilingDedicatedspacePanel30 in. min. or equipment width6½ ft min.or equipment height6 ft aboveor to ceilingNo pipes, ducts orforeign equipmentin the column
Front elevation: working space in front of the panel and the dedicated electrical space above it (indoors).

Height: 6½ feet, and the 6-inch rule

NEC 110.26(A)(3): the working space must be clear from the floor, grade or platform up to 6½ feet or the height of the equipment, whichever is greater.

Inside that height, other equipment associated with the electrical installation, located above or below the electrical equipment, may extend not more than 6 inches beyond the front of the equipment. That covers things like a wireway or gutter above a row of disconnects.

Two exceptions:

  • Existing dwelling units: service equipment or panelboards rated 200 amperes or less may be in spaces with less than 6½ feet of headroom. This mostly applies to old basements.
  • Meters installed in meter sockets may extend beyond the other equipment.

Limited access and high-voltage separation

Two smaller rules in (A) round out the dimensions:

  • Limited access, NEC 110.26(A)(4). Equipment installed above a suspended ceiling or in a crawl space can't meet the 6½-foot height, so the Code relaxes height there. It still requires a working space at least as wide as the enclosure or 30 inches, whichever is greater, the Table 110.26(A)(1) depth in front of the enclosure, and doors or hinged panels that open at least 90 degrees.
  • Separation from high-voltage equipment, NEC 110.26(A)(5). Where 1000-volt-or-less equipment shares a room or vault with exposed live parts over 1000 volts, the high-voltage equipment must be effectively separated by a partition, fence or screen.

2023 NEC changes to 110.26 you should know

The 2023 edition made two changes that affect real installations and are good exam material:

  • Open doors apply to every working space. The rule that open equipment doors must not impede access to and egress from the working space now sits in the main text of 110.26, so it applies to all equipment, not only large equipment. Access or egress is considered impeded when one or more simultaneously opened equipment doors leave less than 24 inches wide and 6½ feet high of passage.
  • The floor counts. New NEC 110.26(A)(6) requires the grade, floor or platform in the working space to be kept clear and to be as level and flat as practical for the entire required depth and width.

If your state still enforces an earlier edition, check which one before you study; see which NEC edition your state uses.

Clear spaces: no storage, ever

NEC 110.26(B): the required working space shall not be used for storage. When normally enclosed live parts are exposed for inspection or servicing, a working space in a passageway or general open area must be suitably guarded.

This is the violation inspectors write most often after the fact: a shelving unit, a freezer, a water heater or a stack of drywall moved in front of a panel. It also catches new work. A laundry machine or a cabinet installed within the 3-foot depth in front of a dwelling panel is a violation the day it is installed.

Entrance and egress: large equipment and personnel doors

NEC 110.26(C)(1): every working space needs at least one entrance of sufficient area.

Large equipment, NEC 110.26(C)(2). For equipment containing overcurrent, switching or control devices that is rated 1200 amperes or more and over 6 feet wide, there must be one entrance not less than 24 inches wide and 6½ feet high at each end of the working space. The same applies to service disconnecting means grouped under 230.71 where the combined rating is 1200 amperes or more and the lineup is over 6 feet wide.

A single entrance is permitted instead when either:

  • Unobstructed egress: the location permits a continuous and unobstructed way of exit travel, or
  • Extra working space: the depth of the working space is twice that required by Table 110.26(A)(1). The single entrance must then be located so that the distance from the equipment to the nearest edge of the entrance is at least the minimum depth for that voltage and condition.

Personnel doors, NEC 110.26(C)(3). Where equipment rated 800 amperes or more that contains overcurrent, switching or control devices is installed, any personnel door intended for entrance to and egress from the working space and located less than 25 feet from the nearest edge of the working space must open in the direction of egress and have listed panic hardware or listed fire exit hardware.

TriggerRequirement
1200 A or more and over 6 ft wideEntrance at each end, 24 in. × 6½ ft (or one of the two single-entrance options)
800 A or more, door less than 25 ft awayDoor opens outward (egress direction) with listed panic or fire exit hardware
Any equipmentOpen doors must not reduce access below 24 in. × 6½ ft (2023)

Illumination and locked rooms

NEC 110.26(D): illumination must be provided for all working spaces about service equipment, switchboards, switchgear, panelboards and motor control centers installed indoors. The lighting shall not be controlled by automatic means only. A motion sensor by itself is not enough; it needs a manual way to turn the light on. Additional lighting outlets are not required where the space is lit by an adjacent light source.

NEC 110.26(F): electrical equipment rooms or enclosures controlled by a lock are considered accessible to qualified persons. Locking the room does not remove the working space requirements.

Dedicated equipment space (110.26(E))

Switchboards, switchgear, panelboards and motor control centers must be located in dedicated spaces and protected from damage.

Indoors, NEC 110.26(E)(1):

  • Dedicated electrical space: the space equal to the width and depth of the equipment, extending from the floor to 6 feet above the equipment or to the structural ceiling, whichever is lower, is reserved for the electrical installation. No piping, ducts, leak protection apparatus or other foreign equipment may be located in this zone. Suspended ceilings with removable panels are permitted in it.
  • Foreign systems may be located above that zone only if protection is installed so condensation, leaks or breaks cannot damage the electrical equipment.
  • Sprinkler protection is permitted for the dedicated space where the piping complies with the section.
  • A dropped or suspended ceiling that does not add strength to the building is not a structural ceiling.

Outdoors, NEC 110.26(E)(2): equipment must be in identified enclosures, protected from accidental contact by unauthorized persons and from vehicular traffic, and protected from accidental spillage or leakage from piping systems. The working space may not contain architectural appurtenances or other equipment (structural overhangs and roof extensions are allowed). The dedicated equipment space extends from grade to 6 feet above the equipment.

The exception for the whole of (E): control equipment that by its nature or by other Code rules must be adjacent to or within sight of its machinery may be installed there.

Worked examples, built like exam questions

Worked example

480Y/277 panelboard facing a concrete wall

  1. 1

    The question

    A 480Y/277-volt panelboard is installed on a wall. Directly opposite, across the aisle, is a concrete block wall. What is the minimum depth of working space?

  2. 2

    Voltage to ground

    480Y/277 V is 277 V to ground: the 151–600 V row.

  3. 3

    Condition

    Live parts on one side, a concrete wall (considered grounded) on the other: Condition 2.

  4. ✓ Answer: 3½ feet.
Worked example

208Y/120 panel facing the same wall

  1. 1

    Voltage to ground

    208Y/120 V is 120 V to ground: the 0–150 V row.

  2. 2

    Condition

    Condition 2 again, but in the 0–150 V row every condition is the same.

  3. ✓ Answer: 3 feet. Many candidates answer 3½ because they use 208 V instead of 120 V to ground.
Worked example

Two 480-volt switchboards facing each other

  1. 1

    The question

    Two 480Y/277-volt switchboards in new construction face each other across an aisle. Either one may have its covers off for servicing. What is the minimum aisle depth?

  2. 2

    Condition

    With live parts that can be exposed on both sides of the working space, this is Condition 3.

  3. 3

    Table

    151–600 V, Condition 3 = 4 ft.

  4. ✓ Answer: 4 feet. The existing-building relaxation to Condition 2 (with written procedures) does not apply to new construction.
Worked example

A 2000-amp, 8-foot-wide switchboard

  1. 1

    Trigger

    2000 A is 1200 A or more, and 8 ft is over 6 ft wide: 110.26(C)(2) applies.

  2. 2

    Requirement

    An entrance at least 24 in. wide and 6½ ft high at each end of the working space, unless the egress path is continuous and unobstructed, or the working space depth is doubled.

  3. 3

    Doors

    The equipment is also 800 A or more, so any personnel door within 25 ft of the working space must open outward with listed panic or fire exit hardware.

  4. ✓ Answer: Two entrances (or one of the single-entrance options), plus outward-opening doors with panic or fire exit hardware within 25 ft.

Practice: working clearance exam questions

Exam-style question

What is the minimum depth of working space in front of a 120/240-volt, single-phase panelboard with a concrete wall on the opposite side?

Pick an answer to see the explanation.

Exam-style question

Indoors, the dedicated electrical space above a panelboard extends from the floor to what height?

Pick an answer to see the explanation.

Exam-style question

Equipment rated 1200 A and 7 ft wide requires an entrance to the working space at each end. What is the minimum size of each entrance?

Pick an answer to see the explanation.

The mistakes that cost points (and inspections)

Using line-to-line voltage. 208Y/120 is 120 V to ground (3 ft). 480Y/277 is 277 V to ground (3½ or 4 ft at Conditions 2 and 3).

Forgetting that walls are grounded. Concrete, brick and tile walls make the space Condition 2. A wall with no live or grounded parts, such as drywall on wood studs, is generally treated as Condition 1; when in doubt, ask the AHJ.

Treating 30 inches as fixed. The width is 30 inches or the equipment width, whichever is greater.

Measuring from the wall. Depth is measured from the live parts, or from the front of the enclosure.

Mixing up working space and dedicated space. In front versus above.

Assuming a locked room is exempt. A locked room is accessible to qualified persons, and the full working space still applies.

Applying 110.26 above 1000 volts. Equipment over 1000 V nominal uses Part III of Article 110, with its own depth table in 110.34(A). See what is considered high voltage for where the NEC draws that line.

Working space in other special installations

The same working space rules apply in the special-occupancy articles, which build on them rather than replace them:

  • Emergency and standby systems. Transfer switches, generator disconnects and emergency panelboards all need full 110.26 working space, and many jurisdictions inspect it closely because these systems are tested under load. See emergency vs standby systems (Articles 700, 701 and 702).
  • Hazardous (classified) locations. Explosionproof panels and motor starters still need their working space, and the space itself may be inside a classified area, which changes the wiring method all the way to the enclosure. See hazardous locations: Class I, II, III and Divisions 1 and 2.
  • Service equipment. The service disconnect is the equipment most often tested for working space, and its location rules in Article 230 interact with 110.26. See service-entrance conductors.
→Next in special topicsEmergency vs Standby Systems: NEC Articles 700, 701 and 702

OSHA enforces a parallel requirement for workplaces: 29 CFR 1910.303 requires sufficient access and working space about electric equipment, with its own minimum-depth table for 600 volts and less. The NEC is what your exam tests; OSHA is what an employer gets cited under.

How to find 110.26 fast in the code book

Article 110 is near the front of the book, in Part II (1000 volts, nominal, or less). Put one tab on 110.26 and highlight four things: Table 110.26(A)(1), the three Condition definitions right below it, the 30-inch and 6½-foot numbers in (A)(2) and (A)(3), and the 1200 A / 800 A triggers in (C). Our guide to tabbing your NEC code book shows where each tab goes.

→Special topics: classified locationsHazardous Locations: Class I, II, III and Divisions 1 and 2

Working space questions are quick points once you have the table and the three conditions down. Next, learn the special installations that build on them, starting with hazardous locations and emergency systems, then check yourself under the clock with the free journeyman practice test or the practice tests page.