Table 220.55 is the NEC table that tells you how much load a household electric range, wall oven or cooktop adds to a service, feeder or branch circuit. For one range rated 12 kW or less, Column C gives 8 kW. Bigger ranges, several ranges, and separate ovens and cooktops are handled by Columns A and B and Notes 1 through 4.
Cooking equipment is on nearly every load calculation question, and the notes under the table are where people lose points. This guide explains each column and note, then runs the calculations the exam actually asks for: a large range, unequal ranges, a cooktop with ovens, an apartment building and a range branch circuit.
What Table 220.55 covers and why demand factors exist
NEC 220.55 applies to household electric ranges, wall-mounted ovens, counter-mounted cooking units and other household cooking appliances individually rated over 1¾ kW. The table replaces the nameplate rating with a lower demand value because a range almost never draws its full rating: you rarely run every burner and the oven at full heat at once, and the elements cycle.
Two rules in the section text are worth knowing before you open the table:
- kVA = kW. For loads calculated under 220.55, kilovolt-amperes are considered equivalent to kilowatts. A 12 kW range is a 12 kVA load.
- Three-phase systems. Where two or more single-phase ranges are supplied by a 3-phase, 4-wire feeder or service, the total load is calculated on the basis of twice the maximum number connected between any two phases.
The three columns of Table 220.55
| Number of appliances | Column A: less than 3½ kW (%) | Column B: 3½ to 8¾ kW (%) | Column C: max demand, not over 12 kW (kW) |
|---|---|---|---|
| 1 | 80 | 80 | 8 |
| 2 | 75 | 65 | 11 |
| 3 | 70 | 55 | 14 |
| 4 | 66 | 50 | 17 |
| 5 | 62 | 45 | 20 |
| 6 | 59 | 43 | 21 |
| 7 | 56 | 40 | 22 |
| 8 | 53 | 36 | 23 |
| 9 | 51 | 35 | 24 |
| 10 | 49 | 34 | 25 |
| 11 | 47 | 32 | 26 |
| 12 | 45 | 32 | 27 |
The table continues past 60 appliances. For more than 12, read the row in your code book.
Notice the two different kinds of numbers. Columns A and B are percentages you multiply by the total nameplate rating. Column C is a load in kW, already calculated for you. Mixing those up (taking 8% of something, or multiplying by "11") is a classic early mistake.
8 kW
one range, not over 12 kW (Col. C)
+5%
per kW above 12 kW (Note 1)
70%
range load on the neutral (220.61)
Note 1: ranges rated over 12 kW (the 5% rule)
For ranges individually rated more than 12 kW but not more than 27 kW, all of the same rating, increase the Column C demand by 5% for each additional kW of rating, or major fraction thereof, above 12 kW.
Note 1
Demand = Column C × (1 + 0.05 × kW over 12)
"Major fraction" means more than half. 2.6 kW over counts as 3; 1.4 kW over counts as 1.
One 16 kW range
- 1
Column C starting value
One range: 8 kW
- 2
Excess over 12 kW
16 − 12 = 4 kW → 4 × 5% = 20%
- 3
Increase
8 kW × 1.20 = 9.6 kW
Same method for several equal ranges: 10 apartments with one 14 kW range each. Column C for 10 ranges = 25 kW. 14 − 12 = 2 kW → 10%. 25 × 1.10 = 27.5 kW.
Note 2: ranges of unequal ratings
For ranges individually rated more than 8¾ kW and of different ratings (up to 27 kW), find the average rating. Count any range rated less than 12 kW as 12 kW when you average. Then apply the 5% increase from Note 1 to the Column C value for the number of ranges.
Three ranges: 10 kW, 14 kW and 16 kW
- 1
Average, using 12 kW for the small one
(12 + 14 + 16) ÷ 3 = 42 ÷ 3 = 14 kW average
- 2
Excess over 12 kW
14 − 12 = 2 kW → 10%
- 3
Column C for 3 ranges, increased
14 kW × 1.10 = 15.4 kW
Note 3: using Column A or B instead of Column C
Note 3 is an alternative for appliances rated more than 1¾ kW through 8¾ kW: add the nameplate ratings and multiply the sum by the Column A or Column B factor for the number of appliances. When some appliances fall in Column A and others in Column B, apply each column's factor to its own group and add the results.
This is how you usually handle separate wall ovens and cooktops on a service calculation, because it often gives a smaller number than Column C.
Cooktop 6 kW + wall oven 4.5 kW, service calculation
- 1
Which column?
Both are between 3½ and 8¾ kW → Column B
- 2
Factor for 2 appliances
Column B, 2 appliances = 65%
- 3
Multiply the total nameplate
(6 + 4.5) × 0.65 = 10.5 × 0.65 = 6.825 kW
Mixed columns: a building with four 3 kW cooktops (Column A) and four 6 kW ovens (Column B). Column A, 4 appliances: 4 × 3 = 12 kW × 66% = 7.92 kW. Column B, 4 appliances: 4 × 6 = 24 kW × 50% = 12 kW. Total 19.92 kW.
Note 4: branch-circuit load for ranges, ovens and cooktops
Note 4 sets the branch-circuit load, which is a different question from the service load:
- One range: the branch-circuit load may be calculated from Table 220.55 (8 kW for one range not over 12 kW).
- One wall oven or one counter-mounted cooking unit: the branch-circuit load is its nameplate rating.
- One counter-mounted cooking unit and not more than two wall-mounted ovens, all supplied from a single branch circuit and in the same room: add the nameplate ratings and treat the total as one range.
Cooktop + two ovens on one circuit
- 1
The question
A kitchen has a 6 kW cooktop and two 4 kW wall ovens, all on one branch circuit in the same room. What is the branch-circuit load at 240 V?
- 2
Add and treat as one range
6 + 4 + 4 = 14 kW, treated as one 14 kW range
- 3
Apply Note 1
14 − 12 = 2 kW → 10%. 8 kW × 1.10 = 8.8 kW
- 4
Amperes
8,800 ÷ 240 = 36.7 A
Range branch circuits: breaker, wire and neutral
NEC 210.19(C) (210.19(A)(3) in the 2020 NEC) sets the range rules you need on the job and on the exam:
- A branch circuit for a household range rated 8¾ kW or more must have a rating of at least 40 A.
- Tap conductors (Exception No. 1) from a 50 A range branch circuit to a wall oven or cooktop may be rated not less than 20 A, sized for the load, and no longer than necessary for servicing.
- The neutral (Exception No. 2) of a 3-wire range branch circuit may be smaller than the ungrounded conductors when the demand is 8¾ kW or more, but not less than 70% of the branch-circuit rating and not smaller than 10 AWG.
For a 12 kW range: 8,000 ÷ 240 = 33.3 A, so a 40 A circuit. With NM cable (60°C ampacity), 8 AWG copper is rated 40 A in Table 310.16. See 8 AWG wire ampacity for when the 50 A and 55 A values apply instead.
The neutral and the 3-phase rule
On a feeder or service, NEC 220.61(B)(1) lets you take the range demand from Table 220.55 at 70% for the neutral. One 12 kW range: 8 kW × 0.70 = 5.6 kW on the neutral. The same 70% applies to dryers calculated under Table 220.54.
For single-phase ranges on a 3-phase, 4-wire service (common in apartment buildings), use twice the maximum number of ranges connected between any two phases:
30 ranges (12 kW) on a 208Y/120 V 3-phase service
- 1
Ranges per phase pair
30 ranges spread evenly = 10 between each pair of phases. Twice that = 20
- 2
Column C for 20 ranges
20 ranges = 35 kW
- 3
Per phase, then total
35 ÷ 2 = 17.5 kW per phase. 17.5 × 3 = 52.5 kW
Note 5, the last note under the table, simply extends Table 220.55 to household cooking appliances rated over 1¾ kW that are used in instructional programs (school culinary labs, for example).
Mistakes that cost points on cooking-load questions
Using the nameplate in a standard calculation. One 12 kW range is 8 kW, not 12 kW. (The optional method is the exception: there the range goes in at nameplate before the 40% factor.)
Applying Note 1 from the nameplate instead of from Column C. You increase the Column C value, not the rating.
Rounding "major fraction" wrong. 13.4 kW is 1 kW over (5%), not 2 kW. 14.6 kW is 3 kW over (15%).
Averaging unequal ranges with their real ratings. Under Note 2, anything below 12 kW is counted as 12 kW.
Treating Columns A and B as kW. They are percentages of the total nameplate rating.
Using Note 4 for the service. Note 4 is the branch-circuit load. For the service, use Column C or the Note 3 alternative.
Exam-style questions
Exam-style question
What is the demand load for one 14 kW household range using Table 220.55?
Pick an answer to see the explanation.
Exam-style question
An apartment building has 10 units, each with a 12 kW range. What is the demand load for the ranges on the service?
Pick an answer to see the explanation.
Exam-style question
A 7 kW counter-mounted cooktop is supplied by its own branch circuit. What is the branch-circuit load?
Pick an answer to see the explanation.
Exam-style question
For the service neutral calculation, what load is used for one 12 kW range?
Pick an answer to see the explanation.
How to find it fast and where to go next
Table 220.55 sits in Article 220, Part III, right after the dryer section (220.54). Tab the page and highlight the Column C heading and Notes 1, 3 and 4. Those three notes produce nearly every cooking question.
The range is one line in a larger calculation, so practice it in context: run the full standard method dwelling load calculation, then size the circuit with standard breaker sizes and the Table 310.16 ampacity chart. If you want the circuit-level rules for ranges and other appliances, the Article 210 branch circuit guide covers them.
You can read the full table in NFPA 70 through the NFPA 70 page. Then test your speed on cooking-load questions with a free journeyman practice test.