The main bonding jumper is the connection between the neutral (grounded conductor) and the equipment grounding system at the service, usually the green screw or bonding strap in the service panel. The system bonding jumper is the same connection at a separately derived system, such as the secondary of a transformer. Both are sized from NEC Table 250.102(C)(1), and each system gets exactly one: never a second bond in a subpanel.

This guide shows where each jumper belongs under the 2023 NEC, how to size them (including the 12.5% rule for large services), what changes with transformers and generators, and the subpanel mistakes exam questions are built on.

Definitions: MBJ and SBJ in the 2023 NEC

Both terms are defined in NEC Article 100:

  • Bonding jumper, main: the connection between the grounded circuit conductor and the equipment grounding conductor, or the supply-side bonding jumper, or both, at the service.
  • Bonding jumper, system: the connection between the grounded circuit conductor and the supply-side bonding jumper, or the equipment grounding conductor, or both, at a separately derived system.

The definitions are nearly word for word the same. The only difference is the location: service vs separately derived system. A separately derived system is a premises wiring system whose power comes from a source other than the service, such as a transformer, a generator or a battery system, with no direct connection to the supply conductors of another system other than through grounding and bonding connections.

Main bonding jumper

  • At the service
  • Inside the service disconnect enclosure
  • 250.24(C) and 250.28
  • Neutral comes from the utility
  • One per service disconnect enclosure

System bonding jumper

  • At a separately derived system
  • At the source or the first disconnect, at one point
  • 250.30(A)(1) and 250.28
  • Neutral is created by the transformer or generator
  • One per separately derived system

Why the neutral-to-ground bond exists

When a hot conductor faults to a metal enclosure, the fault current flows on the equipment grounding conductor back toward the source. The equipment grounding system is not connected to the transformer's winding on its own. The bonding jumper is the bridge: it ties the EGC system to the neutral, and the neutral carries the fault current back to the transformer. Without it, the fault current would have only the earth as a return path, and as the grounding vs bonding guide shows, the earth cannot draw enough current to trip a breaker.

That is also why there must be only one bond. A second bond downstream puts the EGCs, raceways and enclosures in parallel with the neutral, so normal neutral current flows on metal parts that people touch.

Service panelNGMBJ: bondedTransformer (SDS)X0GSBJ: bondedSubpanelNGNo bond250.24(C), 250.28250.30(A)(1)250.24(B), 250.142(B)Size MBJ and SBJ from Table 250.102(C)(1)
One neutral-to-ground bond per system: at the service (MBJ) and at the transformer's separately derived system (SBJ), never in a subpanel.

The main bonding jumper: 250.24(C) and 250.28

NEC 250.24(C) requires, for a grounded system, an unspliced main bonding jumper to connect the equipment grounding conductor(s) and the service-disconnect enclosure to the grounded conductor within the enclosure for each service disconnect, in accordance with 250.28. Where more than one service disconnecting means is located in an assembly listed for use as service equipment, one unspliced MBJ bonds the grounded conductor(s) to the assembly enclosure.

NEC 250.28 sets four requirements that apply to both main and system bonding jumpers:

250.28Requirement
(A) MaterialCopper, aluminum, copper-clad aluminum, or other corrosion-resistant material
(B) ConstructionWire, bus, screw, or similar suitable conductor. A screw must have a green finish visible with the screw installed
(C) AttachmentConnected as required by 250.8
(D) SizeNot smaller than Table 250.102(C)(1); 12.5% rule for large conductors; rules for multiple enclosures

In a typical residential panel, the MBJ is a green bonding screw that passes through the neutral bar into the enclosure, or a bonding strap from the neutral bar to the enclosure. It ships loose or installed, and the instructions say to use it only when the panel is service equipment.

Sizing: Table 250.102(C)(1) and the 12.5% rule

NEC 250.28(D)(1) requires main and system bonding jumpers to be not smaller than the sizes in NEC Table 250.102(C)(1), based on the largest ungrounded supply conductor, or the equivalent area for parallel conductors.

Largest ungrounded conductor: copperLargest ungrounded conductor: aluminum or CCABonding jumper: copperBonding jumper: aluminum or CCA
2 AWG or smaller1/0 AWG or smaller8 AWG6 AWG
1 or 1/0 AWG2/0 or 3/0 AWG6 AWG4 AWG
2/0 or 3/0 AWG4/0 AWG or 250 kcmil4 AWG2 AWG
Over 3/0 AWG through 350 kcmilOver 250 kcmil through 500 kcmil2 AWG1/0 AWG
Over 350 kcmil through 600 kcmilOver 500 kcmil through 900 kcmil1/0 AWG3/0 AWG
Over 600 kcmil through 1100 kcmilOver 900 kcmil through 1750 kcmil2/0 AWG4/0 AWG
Over 1100 kcmilOver 1750 kcmilSee 12.5% ruleSee 12.5% rule

Note 1 to Table 250.102(C)(1)

Above 1100 kcmil Cu or 1750 kcmil Al: jumper area ≥ 12.5% × largest ungrounded conductor area (or equivalent parallel area)

The rows match NEC Table 250.66 up to 1100 kcmil copper. The difference is at the top: a grounding electrode conductor stops at 3/0 copper, but a bonding jumper keeps growing because it must carry the full available fault current back to the source. If the jumper and the supply conductors are different materials, a note to the table bases the jumper on an equivalent-ampacity conductor of the jumper's material.

Worked example

200 A dwelling service

  1. 1

    The question

    A 200 A dwelling service uses 4/0 AWG aluminum service-entrance conductors. What is the minimum copper main bonding jumper?

  2. 2

    Read the table

    Aluminum column, "4/0 AWG or 250 kcmil" row → 4 AWG copper (2 AWG aluminum).

  3. ✓ Answer: 4 AWG copper. If the panel is listed service equipment, the bonding screw or strap supplied with it is sized for the panel's rating and satisfies 250.28.
Worked example

Large service: the 12.5% rule

  1. 1

    The question

    A service has three parallel sets of 600 kcmil copper per phase. What is the minimum copper main bonding jumper?

  2. 2

    Equivalent area

    3 × 600 kcmil = 1800 kcmil, over 1100 kcmil copper, so Note 1 applies.

  3. 3

    12.5%

    1,800,000 cmil × 0.125 = 225,000 cmil.

  4. 4

    Pick a size (Chapter 9, Table 8)

    4/0 AWG = 211,600 cmil (too small). 250 kcmil = 250,000 cmil.

  5. ✓ Answer: 250 kcmil copper. A 3/0 answer would be the GEC table's ceiling, which does not apply to bonding jumpers.

The system bonding jumper: 250.30(A)(1)

A transformer that steps 480 V down to 208Y/120 V creates a new system with its own neutral (the X0 terminal). Nothing upstream bonds that neutral to ground, so the NEC requires a system bonding jumper at the separately derived system.

NEC 250.30(A)(1) requires the SBJ to be installed at any single point on the separately derived system from the source to the first system disconnecting means or overcurrent device, or at the source of a system that has no disconnecting means or overcurrent devices. It must comply with NEC 250.28(A) through (D), so it is sized from Table 250.102(C)(1) based on the derived ungrounded conductors, the secondary conductors.

Two location choices exist, and each one sets up the rest of the installation:

SBJ at the transformer (source)SBJ at the first disconnect
Neutral bonded to the transformer enclosureNeutral bonded in the first disconnect enclosure
A supply-side bonding jumper runs with the secondary conductors to the disconnect (250.30(A)(2))The grounded conductor is run to the disconnect, sized per 250.30(A)(3)
GEC connects at the transformerGEC connects at the disconnect

The rule that ties it together: the grounding electrode conductor for the separately derived system connects to the grounded conductor at the same point where the system bonding jumper is connected (NEC 250.30(A)(5)). Bonding at both the source and the first disconnect is generally not permitted because it creates a parallel path for neutral current; a narrow exception exists only where doing so does not establish a parallel path.

Worked example

75 kVA transformer: SBJ and GEC

  1. 1

    The question

    A 75 kVA, 480 V to 208Y/120 V three-phase transformer has secondary conductors of 250 kcmil copper. Size the system bonding jumper and the grounding electrode conductor.

  2. 2

    Secondary current (for context)

    75,000 ÷ (208 × 1.732) = 75,000 ÷ 360.3 = 208 A. 250 kcmil copper is rated 255 A in the 75°C column.

  3. 3

    System bonding jumper

    Table 250.102(C)(1), copper, "Over 3/0 through 350 kcmil" → 2 AWG copper.

  4. 4

    GEC

    NEC 250.30(A)(5) sizes it from Table 250.66 using the derived ungrounded conductors: same row → 2 AWG copper.

  5. ✓ Answer: SBJ 2 AWG Cu and GEC 2 AWG Cu, both connected at the same point on the derived system.

For the transformer current and overcurrent side of this question, see transformer calculations.

→The jumper that pairs with an SBJ at the sourceSupply-Side Bonding Jumper (SSBJ): Sizing and Where It's Required

Generators: separately derived or not?

A generator is a separately derived system only when its neutral is not solidly connected to the normal supply's neutral, typically because the transfer switch switches the neutral (a 4-pole switch on a three-phase four-wire system, or a switched neutral on a single-phase system). Then the generator gets its own system bonding jumper. If the transfer switch keeps the neutral solidly connected, the generator neutral is already bonded at the service, and adding a bond at the generator would create a second bond. Check the generator and transfer switch together before deciding.

Separate buildings and subpanels: where the bond does not go

On the load side of the service disconnect, the rule is separation:

  • NEC 250.24(B): no grounding connection to the grounded conductor on the load side of the service disconnecting means, except as permitted by 250.30, 250.32 and 250.142.
  • NEC 250.142(B): the grounded conductor is not used to ground equipment on the load side of the service disconnect, with limited exceptions such as existing range and dryer circuits under 250.140.
  • NEC 250.32(B)(1): a separate building supplied by a feeder gets an EGC run with the feeder, and the grounded conductor is not connected to the EGC or the electrode at that building. The building still has its own grounding electrode system.

That is why a 60 amp subpanel is fed with four wires and has a floating neutral bar.

Exam questions on bonding jumpers

Exam-style question

The connection between the grounded circuit conductor and the equipment grounding conductor at a separately derived system is the:

Pick an answer to see the explanation.

Exam-style question

A service consists of two parallel sets of 800 kcmil copper per phase. What is the minimum size copper main bonding jumper?

Pick an answer to see the explanation.

Exam-style question

A screw used as a main bonding jumper shall be identified by:

Pick an answer to see the explanation.

Exam-style question

In a panelboard supplied by a feeder from the service in the same building, the grounded conductor shall be:

Pick an answer to see the explanation.

Common mistakes with bonding jumpers

Bonding the neutral in a subpanel. One bond per system, at the service or the SDS.

Bonding at both the transformer and the first disconnect. Pick one point, and connect the GEC there.

Using Table 250.66 above 1100 kcmil. Bonding jumpers use the 12.5% rule.

Using the transformer primary conductors to size the SBJ. Size from the derived (secondary) conductors.

Assuming every generator needs a bond. Only if it is a separately derived system.

Find it fast in the code book

The MBJ and SBJ live in Part II of Article 250: NEC 250.24 for services, NEC 250.28 for the jumper itself, NEC 250.30 for separately derived systems and NEC 250.32 for separate buildings. Table 250.102(C)(1) is in Part V, with the bonding rules. The IAEI feature on separately derived systems is a useful read on transformer installations.

The neutral and ground distinction underneath all this is covered in grounded vs grounding conductor, and the hub for the whole topic is grounding vs bonding. When you are ready, run a timed journeyman electrician practice test.