A supply side bonding jumper (written in the NEC as supply-side bonding jumper, or SSBJ) is the bonding conductor used where there is no overcurrent device ahead of it: on the line side of the service disconnect, inside service equipment, and between a transformer and its first disconnect. It is sized from Table 250.102(C)(1) based on the largest ungrounded supply conductor, and above 1100 kcmil copper it must be at least 12.5% of the conductor area.
This guide covers where an SSBJ is required under the 2023 NEC, how to size it for single and parallel raceways, how it differs from an equipment grounding conductor, and how the exam tests it. Every sizing example is worked step by step.
What is a supply-side bonding jumper?
NEC Article 100 defines the supply-side bonding jumper as a conductor installed on the supply side of a service or within a service equipment enclosure(s), or for a separately derived system, that ensures the required electrical conductivity between metal parts required to be electrically connected.
The key word is supply side. On the load side of a breaker, a fault is cleared by that breaker, so the equipment grounding conductor is sized from the breaker rating with Table 250.122. On the supply side of the service disconnect, the only overcurrent protection is the utility's, often a transformer fuse sized for the utility's purposes. Nothing on your side limits the fault current. So the SSBJ is sized from the size of the conductors it runs with, the same way the main bonding jumper is.
Supply-side bonding jumper
- Ahead of the service disconnect or SDS first disconnect
- No OCPD ahead of it on your side
- Sized from conductor size
- Table 250.102(C)(1)
- 12.5% rule above 1100 kcmil Cu
Equipment grounding conductor
- Load side of an OCPD
- The breaker or fuse clears the fault
- Sized from OCPD rating
- Table 250.122
- Upsized proportionally if hots are upsized
Where an SSBJ is required
Service raceways and enclosures: 250.92
NEC 250.92(A) requires the normally non-current-carrying metal parts of service equipment to be bonded together: service raceways, cable trays, cablebus, auxiliary gutters, service cable armor or sheath, and all enclosures containing service conductors, including meter fittings and boxes, interposed in the service raceway or armor.
NEC 250.92(B) lists how those connections must be made. Standard locknuts alone are not enough on service raceways. Acceptable methods include:
- Bonding to the grounded service conductor (the neutral), for example a jumper from a bonding bushing to the neutral bar in the meter socket.
- Threaded couplings or threaded hubs on enclosures with threaded conduit, made up wrenchtight.
- Threadless couplings and connectors made up tight for metal raceways and metal-clad cables.
- Other listed devices, such as bonding-type locknuts, bonding bushings, or bushings with bonding jumpers.
And where a connection is impaired, the rule is explicit: bonding jumpers must be used around reducing washers or oversized, concentric or eccentric knockouts. A concentric knockout with only one ring removed is not a reliable bond, so a bonding bushing with a jumper is installed. Those jumpers are supply-side bonding jumpers, sized from NEC 250.102(C).
Separately derived systems: 250.30(A)(2)
When the source of a separately derived system (typically a transformer) and the first disconnecting means are in separate enclosures, NEC 250.30(A)(2) requires an SSBJ to be installed with the circuit conductors from the source enclosure to the first disconnecting means. It can be of the nonflexible metal raceway type or of the wire or bus type, and if it is a wire, it is sized from NEC Table 250.102(C)(1) based on the derived ungrounded conductors.
This is the partner of the system bonding jumper: if the system bonding jumper is at the transformer, the SSBJ carries fault current from the downstream disconnect enclosure back to that bond point.
Sizing an SSBJ: Table 250.102(C)(1)
NEC 250.102(C)(1): where the supply conductors are in a single raceway or cable, the SSBJ is not smaller than the size shown in Table 250.102(C)(1), based on the largest ungrounded supply conductor.
| Largest ungrounded conductor: copper | Largest ungrounded conductor: aluminum or CCA | SSBJ: copper | SSBJ: aluminum or CCA |
|---|---|---|---|
| 2 AWG or smaller | 1/0 AWG or smaller | 8 AWG | 6 AWG |
| 1 or 1/0 AWG | 2/0 or 3/0 AWG | 6 AWG | 4 AWG |
| 2/0 or 3/0 AWG | 4/0 AWG or 250 kcmil | 4 AWG | 2 AWG |
| Over 3/0 AWG through 350 kcmil | Over 250 kcmil through 500 kcmil | 2 AWG | 1/0 AWG |
| Over 350 kcmil through 600 kcmil | Over 500 kcmil through 900 kcmil | 1/0 AWG | 3/0 AWG |
| Over 600 kcmil through 1100 kcmil | Over 900 kcmil through 1750 kcmil | 2/0 AWG | 4/0 AWG |
| Over 1100 kcmil | Over 1750 kcmil | 12.5% rule | 12.5% rule |
12.5% rule (Note 1 to Table 250.102(C)(1))
SSBJ area ≥ 0.125 × area of largest ungrounded conductor (or equivalent parallel area)
Notes to the table also cover different materials: where the ungrounded supply conductors and the jumper are of different materials (copper, aluminum, copper-clad aluminum), the jumper is sized as if the supply conductors were of the jumper's material with an equivalent ampacity.
Single raceway service
- 1
The question
A 400 A service has one set of 600 kcmil copper conductors in a rigid metal conduit that enters the service enclosure through a concentric knockout. What size copper bonding jumper is required at the bonding bushing?
- 2
Identify the jumper
It is on the supply side of the service disconnect, so it is an SSBJ sized under NEC 250.102(C)(1).
- 3
Read the table
600 kcmil copper → "Over 350 through 600 kcmil" → 1/0 AWG copper.
Parallel raceways: 250.102(C)(2)
Large services and transformer secondaries are often run in parallel through several raceways. NEC 250.102(C)(2) gives two options:
- A jumper in (or for) each raceway: each SSBJ is sized from Table 250.102(C)(1) based on the largest ungrounded conductor in that raceway.
- One jumper bonding all the raceways: a single SSBJ is sized from the equivalent area of all the parallel ungrounded conductors of one phase, applying the 12.5% rule above 1100 kcmil copper or 1750 kcmil aluminum.
Four metal conduits, two ways
- 1
The question
A 1200 A service runs four parallel sets of 350 kcmil copper, one set in each of four rigid metal conduits entering a switchboard. Size the copper supply-side bonding jumpers.
- 2
Option A: one jumper per conduit
Each conduit holds 350 kcmil copper → "Over 3/0 through 350 kcmil" → 2 AWG copper jumper for each conduit.
- 3
Option B: one jumper for all four
Equivalent area = 4 × 350 = 1400 kcmil, over 1100 kcmil. 12.5% × 1,400,000 = 175,000 cmil.
- 4
Pick a size
3/0 AWG = 167,800 cmil (too small). 4/0 AWG = 211,600 cmil.
Transformer to first disconnect
- 1
The question
A transformer's system bonding jumper is installed at the transformer. The secondary conductors are 350 kcmil copper in a PVC conduit to the first disconnect. Size the SSBJ.
- 2
Why a wire is needed
PVC is not a bonding path, so the SSBJ must be a wire run with the derived conductors (NEC 250.30(A)(2)).
- 3
Read the table
350 kcmil copper → 2 AWG copper.
For background on parallel conductor sets, see wire size for a 400 amp service, and for the circular-mil math, the main bonding jumper guide uses the same 12.5% method.
Installation rules: 250.102(A), (B) and (E)
- Material (NEC 250.102(A)): copper, aluminum, copper-clad aluminum or other corrosion-resistant material; wire, bus, screw or similar suitable conductor.
- Attachment (NEC 250.102(B)): attached in the manner specified in NEC 250.8 (listed pressure connectors, exothermic welding, and the other methods listed there).
- Inside or outside (NEC 250.102(E)): a bonding jumper can be installed inside or outside a raceway or enclosure. Outside, its length cannot exceed 6 ft, and it must be routed with the raceway or enclosure. Inside a raceway, it must meet the identification and installation rules for equipment grounding conductors.
SSBJ vs EGC vs MBJ: which jumper is which?
| Jumper | Location | Sized from | Table |
|---|---|---|---|
| Supply-side bonding jumper | Supply side of service disconnect or SDS first disconnect | Largest ungrounded supply conductor | 250.102(C)(1) |
| Main bonding jumper | Neutral to EGC/enclosure at the service | Largest ungrounded supply conductor | 250.102(C)(1) via 250.28(D) |
| System bonding jumper | Neutral to EGC/SSBJ at an SDS | Largest derived ungrounded conductor | 250.102(C)(1) via 250.28(D) |
| Equipment bonding jumper (load side) | Load side of an OCPD | OCPD rating | 250.122 via 250.102(D) |
| Equipment grounding conductor | Load side of an OCPD | OCPD rating | 250.122 |
The load-side rule, NEC 250.102(D), sends you to Table 250.122 because an overcurrent device is present. The full load-side method is in equipment grounding conductor sizing, and the overall picture is in grounding vs bonding.
→The grounding and bonding hubGrounding vs Bonding: The Difference, Clearly ExplainedExam questions on supply-side bonding jumpers
Exam-style question
A service raceway contains 3/0 AWG copper ungrounded conductors and enters the service enclosure through an eccentric knockout. What is the minimum size copper bonding jumper?
Pick an answer to see the explanation.
Exam-style question
Three parallel sets of 500 kcmil copper service conductors are run in three metal raceways. A single supply-side bonding jumper is used to bond all three raceways. What is its minimum copper size?
Pick an answer to see the explanation.
Exam-style question
A bonding jumper installed on the outside of a raceway shall not exceed ___ in length and shall be routed with the raceway.
Pick an answer to see the explanation.
Common SSBJ mistakes
Sizing from the service rating. Use the conductor size and Table 250.102(C)(1), not Table 250.122.
Stopping at 3/0 copper. That is the GEC ceiling in Table 250.66. Bonding jumpers use the 12.5% rule above 1100 kcmil.
Dividing one large jumper among raceways. Per-raceway jumpers are sized from the conductors in each raceway; a common jumper is sized from the total.
Relying on a standard locknut over a concentric knockout. 250.92(B) requires a bonding jumper around impaired connections.
Forgetting the SSBJ on a transformer with a source bond. If the SBJ is at the transformer, the downstream enclosure needs an SSBJ path back.
Find it fast in the code book
The SSBJ rules are in Part V of Article 250: service bonding in NEC 250.92, bonding jumper sizing in NEC 250.102(C) with Table 250.102(C)(1) right there, and installation in NEC 250.102(E). For separately derived systems, go to NEC 250.30(A)(2) in Part II.