An intersystem bonding termination (IBT) is a listed device, usually a small bonding bar mounted at the meter or service equipment, where telephone, cable TV, satellite and broadband installers connect their bonding conductors to the building's power grounding system. NEC 250.94 requires one outside the enclosure at the service or meter and at the disconnect of any additional building, with room for at least three conductors, connected to the service with at least 6 AWG copper if it is not mounted directly on the enclosure.

This guide explains why intersystem bonding exists, walks through each requirement of the 2023 NEC 250.94, shows how a typical installation is laid out, and covers how exam questions test it.

What an intersystem bonding termination is

NEC Article 100 defines the intersystem bonding termination as a device that provides a means for connecting intersystem bonding conductors for communications systems to the grounding electrode system.

Two pieces of vocabulary:

  • Intersystem bonding conductors are the conductors run by the communications installers, for example from a cable TV ground block, a telephone network interface device, or a satellite dish mast.
  • The IBT is the termination point that receives them, mounted at the service.

The idea is simple: give every low-voltage trade one obvious, accessible, listed place to bond, right at the power service.

Why intersystem bonding matters

A house can have three or four separate systems arriving from outside: the electrical service, a telephone line, a cable TV coax, a satellite dish. Each one is grounded somewhere. If those grounds are not bonded together, a lightning strike nearby or a power line fault can raise one system's ground to a very different voltage than another's.

Equipment that connects to two systems at once, such as a TV on the power cord and the coax, or a modem on power and phone, ends up straddling that voltage difference. The result is damaged equipment, fires and shock hazards. Bonding all of them to one point keeps every system at nearly the same potential, which is the bonding concept from grounding vs bonding applied across systems.

The IBT requirement was introduced in the 2008 NEC. According to an IAEI article on intersystem bonding, part of the motivation was that metal water piping, once a convenient bonding point for communications installers, was increasingly being replaced with nonmetallic pipe, and installers had no standard place left to connect.

NEC 250.94(A): the six IBT requirements

NEC 250.94(A) requires an intersystem bonding termination for connecting intersystem bonding conductors to be provided external to enclosures at the service equipment or metering equipment enclosure and at the disconnecting means for any additional buildings or structures. The IBT must:

#RequirementWhat it means in practice
1Be accessible for connection and inspectionNot behind a locked meter ring, not buried in a wall
2Have terminals for not less than three intersystem bonding conductorsRoom for phone, CATV and satellite/broadband
3Not interfere with opening the enclosure for a service, building or structure disconnect, or metering equipmentDo not mount it across the meter ring or the panel cover
4At the service: be securely mounted and electrically connected to the service enclosure, the meter enclosure, or an exposed nonflexible metallic service raceway, or be mounted at one of these and connected to the enclosure or the GEC with a minimum 6 AWG copper conductorClamp it to the meter base, or mount it nearby and run 6 AWG Cu
5At an additional building's disconnect: be securely mounted and electrically connected to the metallic disconnect enclosure, or mounted at the disconnect and connected to the enclosure or the GEC with a minimum 6 AWG copper conductorSame idea at a detached garage or shop
6Be listed as grounding and bonding equipmentUse a listed IBT product, not a homemade bar

3

minimum bonding conductor terminals

6 AWG Cu

minimum IBT connection to enclosure or GEC

Outside

IBT is external to enclosures

The 2023 exception: no communications, no IBT

The 2023 NEC added an exception to 250.94(A) and (B): a means for connecting intersystem bonding conductors is not required where communications systems are not likely to be used. Think of a detached storage shed or a well-pump house fed by a feeder. The dwelling itself still gets its IBT; the exception is for structures where no phone, cable, satellite or broadband service will ever land. If your jurisdiction is on the 2020 NEC or earlier, this exception does not exist, and the inspector has the final word on what counts as "not likely."

250.94(B): other means

NEC 250.94(B) recognizes an alternative to the IBT device: connections to a copper or aluminum busbar of the size and arrangement described in that section, securely fastened in an accessible location, with room for at least three terminations for communication systems in addition to its other connections. This is the option you see in commercial buildings with a main grounding busbar in the electrical room, where communications bonding lands on the same bar as the power grounding connections. Check the dimensions, connection method and aluminum restrictions in the code text when you use this option.

Where the IBT goes on a typical house

Exterior wallMeterIBTBonded to meteror 6 AWG CuPhone NIDCATV blockSatelliteGECGrounding electrode3 terminals min.Outside the enclosureAccessible, listedDoes not block the cover
Typical dwelling layout: the IBT mounted at the meter, with telephone, CATV and satellite bonding conductors landing on it.
Worked example

Laying out an IBT on a new dwelling service

  1. 1

    The situation

    A new single-family house has an exterior meter socket with the service panel inside. Phone, CATV and a satellite dish are expected. Where and how is the IBT installed?

  2. 2

    Location

    Outside the enclosures, at the meter socket (or the service equipment), per NEC 250.94(A). Mount it beside the meter so it does not block the meter ring or cover.

  3. 3

    Connection to the power system

    Either mount it directly on and electrically connected to the meter enclosure, or mount it at the meter and connect it to the meter enclosure or the GEC with at least 6 AWG copper.

  4. 4

    Capacity and listing

    Pick a listed IBT with at least three terminals. Many products offer more, which helps with fiber and solar monitoring equipment.

  5. ✓ Answer: A listed IBT with three or more terminals, mounted beside the meter outside the enclosure, bonded to the meter enclosure directly or with 6 AWG copper, and left accessible for the communications installers and the inspector.

Which systems bond to the IBT

The IBT itself lives in Article 250, but the requirement to use it comes from the articles for each communications system. Those articles require the bonding conductor for the system to connect to the building's grounding means, with the IBT as the first choice where one is present:

  • Communications circuits (telephone and similar), in the Chapter 8 communications articles.
  • Radio and television distribution, CATV: the coaxial cable shield, usually at a grounding block where the cable enters.
  • Network-powered broadband communications systems.
  • Radio and television antennas and satellite dishes, in Article 810: the mast and the coax discharge unit.
  • Optical fiber cables with non-current-carrying conductive members, in Article 770.

The size of each intersystem bonding conductor, its maximum length and its routing are set by those articles, not by 250.94. On the exam, a question about the conductor from the dish or the coax block points to the communications articles; a question about the IBT itself points to 250.94.

→Other service bonding rules in 250.92Supply-Side Bonding Jumper (SSBJ): Sizing and Where It's Required

IBT vs the other grounding and bonding connections

ConnectionPurposeNEC
IBTBonds communications systems to the power grounding system250.94
Grounding electrode conductorConnects the service to the electrodes250.64, 250.66 (GEC sizing)
Supply-side bonding jumperBonds service raceways and enclosures250.92, 250.102(C)
Main bonding jumperConnects neutral to the grounding system at the service250.24(C), 250.28 (MBJ guide)
Water pipe bonding jumperBonds interior metal water piping250.104(A)

The IBT does not replace any of these. It is an extra, standardized connection point for other trades.

How the exam words IBT questions

IBT questions are short and almost always come down to one of five numbers or words. Learn to spot the trigger in the stem:

If the question asks about...The answer is usually...Source
How many conductors the IBT must acceptNot less than three250.94(A)
The conductor from the IBT to the enclosure or GEC6 AWG copper minimum250.94(A)
Where the IBT is locatedExternal to enclosures at the service equipment or meter enclosure250.94(A)
What else it must not doInterfere with opening the service, disconnect or meter enclosure250.94(A)
What the IBT connects toThe grounding electrode system, for communications systemsArticle 100 definition

Watch for distractors that borrow numbers from neighboring rules: 5 ft (the interior water pipe connection limit in 250.68(C)(1)), 25 ohms (single rod electrodes) and 8 AWG (the smallest GEC in Table 250.66). None of them apply to the IBT.

Exam questions on the IBT

Exam-style question

An intersystem bonding termination shall have the capacity for connection of not less than ___ intersystem bonding conductors.

Pick an answer to see the explanation.

Exam-style question

Where an intersystem bonding termination is mounted at the service but not directly on the service or meter enclosure, it shall be connected to the enclosure or the grounding electrode conductor with a copper conductor not smaller than:

Pick an answer to see the explanation.

Exam-style question

An intersystem bonding termination at a dwelling service shall be located:

Pick an answer to see the explanation.

Common IBT mistakes

Mounting it inside the panel. The IBT is external to the enclosures.

Blocking the meter or panel cover. It must not interfere with opening the enclosure.

Using a homemade bar. The IBT must be listed as grounding and bonding equipment (or meet 250.94(B)).

Undersizing the tie to the service. 6 AWG copper minimum when it is not mounted directly on the enclosure.

Forgetting detached buildings. An additional building with its own disconnect gets its own IBT, unless the 2023 exception applies because communications systems are not likely to be used there.

Treating a separate rod as a substitute. An isolated communications ground is what intersystem bonding prevents.

Find it fast in the code book

NEC 250.94 sits in Part V (Bonding) of Article 250, just after the service bonding rules of 250.92. The definition is in Article 100. For the systems that use it, tab the start of Chapter 8 and Article 770.

The IBT is one of the bonding connections covered in the grounding vs bonding hub. To see how bonding conductors are told apart from circuit conductors in the field, read the electrical wire color code, then test yourself with a free journeyman electrician practice test.